Costco – Central Point Oregon
This project was a turnkey project completed in a minimal 60 day period. This project included 24 fueling positions with Gilbarco MPDs we performed site
Chevron – Woodland Washington
This project was a challenging tank install two 20,0000 gallon tanks as the ground water was very near the surface providing what could be a
Fuel Site Decommission – City of Bend Oregon
The City of Bend hired CSI to decommission one of their fuel locations consisting of two product dispensers and two tanks with diesel and unleaded
Custom Vinyl Wrap Rebranding – Prineville, Oregon
For this Prineville, Oregon gas station, we designed and installed vinyl wraps for the canopy and the fuel dispensers. This was the first time we’ve
Arco Gas Station – Hillsboro, Oregon
Work included: Fuel tank excavation, Placement and anchoring of new tanks, Backfill of tanks, All fuel lines and piping connections installed per DEQ regulations, Construction of
Shell Station Remodel – Culver, Oregon